A sweeping curve for an entry or living hall — the form to choose when the staircase should be the room's centerpiece.
A compact turn that frees up floor space while keeping the room open — a smart fit for lofts and mezzanines.
Open treads with clear sightlines that make a space feel larger and brighter — the contemporary, minimal pick.
A clean straight run — also built as an L- or U-shape — the form to choose when the plan wants a simple line.
HOW WE WORK
From Your Drawing to Your Door
Send a sketch, photo or architect's plan — we return a shop drawing for the staircase and its matched railing before anything is cut. Both are built in our 4,500 m² Guangdong factory, dry-fitted as a set, then export-crated for your installer on site.
SERVICE FLOW
One coordinated process, from first drawing to final step
On every project the staircase and its matched railing share one shop drawing set, are produced together, and are trial-assembled as one system before they ship. Order it as a complete staircase with its matched railing, or have the railing customized on its own.
Our Workflow
01 — Consultation & Quotation · 1–3 days (typical)
Share your drawings, photos or dimensions; we review feasibility and send a quotation.
02 — Order Confirmation · 1–2 days (typical)
We confirm scope, finishes and terms, and start the project once the deposit is in.
03 — Coordinated Shop Drawings · 5–7 days (typical)
From the site dimensions you provide, we draw the staircase and its matched railing as one coordinated set for your approval.
04 — In-House Production · 25–35 days (typical)
Both the stair and its railing are fabricated together in our 4,500 m² Guangdong factory.
05 — Trial Assembly Before Packing · within the 25–35-day production window
We dry-fit the treads and balustrade as a set, so the fit is resolved before crating.
06 — Export Crating & Worldwide Shipping · varies by destination
Labeled, export-ready crates ship to your port — we've delivered to 60+ countries.
07 — Local Installation Support · ~1–2 days on site (typical)
Your local installer assembles on site in about 1–2 days, guided by our shop drawings and install videos. On-site installation is available in select countries — ask us to check yours.
CUSTOM STAIRCASE GALLERY
~See each form built — custom, not off the shelf. ~For villas, luxury apartments, commercial projects, and high-end renovations.
Curved Staircase
Statement curves for villa foyers & boutique lobbies
A sweeping curve that softens a villa foyer or boutique lobby and becomes the quiet centerpiece of the space. Not a stock kit — we customize marble or timber treads, glass or metal railing, and optional step lighting as one matched stair-and-railing set.
Spiral Staircase
Space-saving spirals for luxury apartments & compact villas
A compact spiral for luxury apartments, loft-style rooms, and tight villa footprints — vertical travel that still feels light and sculptural. Made to order with marble or timber treads, curved glass railings, and optional lit steps.